Requirement basis
Describe the duty before selecting the method
DOE's design guidance treats IT conditions, air management, cooling and electrical systems as connected decisions, while UNEP's procurement guidance begins with defined operating conditions and measurable criteria. Keep the requirement technology-neutral until the duty and interfaces are explicit.
Evidence matrix
Assign every input and record
Measurement
Define the boundary before the target
Offer comparison
Keep design, resource use and operations together
Build the research set
Connect the package to the directory
Use the filtered records to identify organisations for further research, then issue the same controlled requirement and evidence matrix to every candidate. Directory inclusion is not proof of design authority, compatibility, resource performance, installed capacity or delivery availability.
Primary references
Sources used for this guide
Sources checked 28 August 2026. Project requirements vary by equipment, cooling method, climate, water context, market and contract; confirm the design basis and obligations with the responsible specialists.