THE INFRASTRUCTURE EXPLORER

From grid to rack.

Explore the systems. Find the specialists. Build a better brief.

Assembling the campusSix systems. One connected view.
CONCEPT CAMPUS / SYSTEM DISCOVERY
Drag to orbit · scroll to zoom
Interactive concept modelIllustrative topology · not an engineered design
Source for your project

Filters update supplier matches across the campus.

REFERENCE CHECK · 2026-09-06

Grounded in DSX.
Clear about the limits.

Original schematic geometry, reviewed against NVIDIA’s published component relationships.

DSX Facilities Infrastructure Design Guide v2.0 · 19 August 2026 ↗
Grid connection
Utility power enters site distribution. Voltage, connection capacity and protection require a project design.
Transformers & switchgear
DSX separates GPU Compute and Network Core distribution. This view shows their branches, without voltage or capacity assumptions.
Standby generation
Standby generation connects to distribution as an alternate source. The equipment count here does not represent a redundancy design.
Core UPS & distribution
The Network Core has a separate continuity strategy. The GPU Compute branch is not shown as universally UPS-backed.
Data hall & commissioning
The racks are generic geometry. They are not a validated NVIDIA rack layout, scalable unit or equipment schedule.
Cooling & heat rejection
Indoor CDUs exchange heat between facility water and a separate rack loop. Outdoor dry coolers reject heat; they are not CDUs.

What this model does not establish

Project dimensions, equipment schedules, capacity, redundancy, thermal performance, live telemetry or NVIDIA supplier validation. BESS, the full central utility plant, air-cooling branches, fibre and civil works are outside this six-system model.

Paths show relationships, not an electrical single-line diagram or hydraulic design. A project engineer must define and verify the actual system.

Demo values stay out of your estimate

NVIDIA’s blueprint walkthrough identifies its UI KPIs and costs as demo data. This workspace does not reuse those values or run Omniverse simulations.

Read the blueprint UI walkthrough ↗

Real records. Illustrative infrastructure. Supplier records are unclaimed discovery aids, not endorsements or proof of compatibility, capacity or availability. Check the source evidence before shortlisting.

Open the directory

YOUR SOURCING WORKSPACE

A better brief
starts with the scope.

Collect systems, review the questions, then take the next step.

US + UKAll project stages

Your package is ready to build.

Add systems from the campus to collect your sourcing scope and evidence questions.

System choices are saved in this browser. Your brief is not sent until you complete a request.