Unclaimed editorial recordconnected-energy.co.uk

Connected Energy

Connected Energy is listed for energy storage & flexibility in United Kingdom and Europe, with United Kingdom launch-market coverage.

Published fit
Utilities, Ports and maritime infrastructure, Energy-intensive manufacturing
Project stages
Site & Plan, Connect & Power, Design & Build, Fit Out & Commission, Operate & Maintain
Marketed coverage
United Kingdom and Europe
Launch market
United Kingdom
Evidence
Last checked 16 September 2026

Detailed editorial profile

What they provide

Connected Energy develops battery-energy storage systems using second-life electric-vehicle batteries from its United Kingdom operating base. Its published M-STOR scope combines modular multi-megawatt systems with modelling, site surveys, installation, monitoring, optimisation and maintenance for behind- and front-of-meter projects.

Capability map
Energy Storage
Project-stage fit
Site & Plan, Connect & Power, Design & Build, Fit Out & Commission, Operate & Maintain
Recorded focus areas
  • Second-life batteries
  • Battery storage
  • Grid services

Published scope

What to shortlist them for

Named services and products

Specific scope found in reviewed first-party material.

  • M-STOR modular battery-energy storage systems
  • Battery-system financial modelling
  • Site surveys
  • Battery-system installation
  • Real-time monitoring and optimisation
  • Technical support and maintenance
  • Battery-as-a-service

Relevant environments

Project, facility or asset contexts the supplier explicitly markets.

  • Utilities
  • Ports and maritime infrastructure
  • Energy-intensive manufacturing
  • Landfill-gas and energy-from-waste sites
  • Heavy industry and recycling
  • Distribution and logistics facilities

Buyer-relevant detail

Technical and delivery facts

Concrete statements found on the supplier's official pages. Confirm that each applies to your exact project.

Published power range

M-STOR is offered in configurations from 1.45 MW to 5.8 MW.

First-party source
Published capacity range

M-STOR is offered from 3.8 MWh to 100 MWh with published durations from 2.3 to 11.7 hours.

First-party source
Battery source

The supplier states that M-STOR uses second-life electric-vehicle batteries.

First-party source

First-party and reviewed pages

Sources

Pages reviewed for this editorial record. They support the labelled claims; they do not prove current capacity or qualification.

  1. About Connected Energy

    First-party source · connected-energy.co.uk

    Supports: Identity, Official website, Marketed coverage, Capabilities.

  2. M-STOR multi-MW battery energy storage systems

    First-party source · connected-energy.co.uk

    Supports: Capabilities.

Before you engage

Confirm directly with the supplier

This directory does not establish live capacity, availability, lead time, pricing, compatibility, performance or current credential validity.

  • Confirm the delivery entity and geographic coverage.
  • Test technical fit against the project specification.
  • Request current accreditations and insurance.
  • Confirm programme, capacity and commercial terms.

Directory classification

How this supplier fits the market

Similar capabilities

Related suppliers