Primary growth market · 346 unclaimed records

United States data-centre suppliers

Browse the US directory through the same twelve capability categories and six project stages used across Critical Supply, then verify every shortlist against current project evidence.

Capability paths

Browse US suppliers by category

Category 01 · 39 records
Connection strategy, ICP delivery, substations, contestable works and high-voltage infrastructure.
Category 02 · 40 records
Transformers, protection, switchgear, power distribution and associated commissioning.
Category 03 · 52 records
UPS systems, batteries, standby generation, temporary power, testing and maintenance.
Category 04 · 39 records
Chillers, precision cooling, CDUs, heat rejection, water systems and thermal controls.
Category 05 · 78 records
MEP design, specialist construction, offsite delivery, testing and integrated systems commissioning.
Category 06 · 39 records
Dark fibre, carrier networks, diverse routes, campus connectivity and network infrastructure.
Category 07 · 37 records
Battery storage, demand flexibility, microgrids, optimisation and grid-support services.
Category 08 · 41 records
Access control, detection, suppression, perimeter security and life-safety systems.
Category 09 · 44 records
Hard FM, planned and reactive maintenance, controls, monitoring and critical environment support.
Category 10 · 41 records
Site selection, planning, cost, programme, sustainability, engineering and commercial advice.
Category 11 · 37 records
IT asset disposition, secure erasure, reuse, recycling and critical facility decommissioning.
Category 12 · 37 records
Technical recruitment, project teams, operations hiring and specialist workforce support.

Project lifecycle

Browse US suppliers by stage

Stage A · 119 records
Select sites, test feasibility, establish power strategy and navigate planning.
Stage B · 99 records
Secure capacity and deliver the resilient electrical infrastructure.
Stage C · 298 records
Coordinate and construct the critical shell, plant and technical systems.
Stage D · 226 records
Install, integrate, test and prove systems before live operation.
Stage E · 241 records
Protect uptime through monitoring, maintenance and disciplined operations.
Stage F · 112 records
Retrofit capacity, improve efficiency and responsibly retire assets.

Official context

Use each source for the question it supports

The Federal Energy Management Program connects IT conditions, air management, cooling, electrical systems, heat recovery and performance metrics; it describes design guidance, not a project approval.
FEMA brings together location-enabled hazard and resilience tools for screening and planning. Their outputs are a starting point for project-specific studies, not a substitute for them.
The FCC explains that fixed availability is provider-reported mass-market service data collected twice a year. It does not establish enterprise capacity, physical route diversity or a deliverable carrier service.
EPA points data-centre stakeholders to water, air, contaminated-land and environmental-data resources while noting the role of state and local authorities in implementation and permitting.

Sources checked 2 October 2026. Confirm the current national, state, local, devolved, regulatory and contractual route for the actual project.

Recently checked

US supplier records with recent source reviews

Browse all 346