Evidence sequence
Six checks before relying on a connection claim
Status ladder
Do not compress the route into available or unavailable
Decision record
Join every claim to a document and owner
Market checks
Use the rule set in force for the actual route
Build the project team
Find the capability, then verify the appointment
Use the directory to research organisations that publish grid-connection, high-voltage, transformer, engineering or delivery capabilities. A listing is not evidence that a firm controls an application, can assign capacity, has a current production slot or is appointed to your project.
Primary references
Sources used for this guide
Sources checked 11 September 2026. Connection rules, tariffs, studies and project facts change; verify the current position with the authorised counterparties for the exact site and load.