Requirement basis
Write the operating sequence before the equipment schedule
UPS efficiency evidence, engine compliance and generator permitting answer different questions. Start with the protected outcome and the transitions the complete system must perform, then attach the product, site, test and operating evidence to that shared basis.
Evidence matrix
Join every claim to an owner and test
Market controls
Classify the equipment and its intended use
Offer comparison
Keep resilience, compliance and operating cost together
Build the research set
Connect the package to the directory
Use the filtered records to identify organisations for further research, then issue the same operating basis and evidence matrix to every candidate. Directory inclusion is not proof of system design, product compatibility, compliance, resilience, installed capacity, service coverage or delivery availability.
Primary references
Sources used for this guide
Sources checked 30 August 2026. Requirements vary by topology, equipment, fuel, intended use, site, market and contract; confirm the design, testing, environmental, safety and legal obligations with the responsible specialists and authorities.