Requirement basis
Write the acceptance chain before testing starts
Current UK property guidance plans the transition into operations from the start of a construction project. The GSA guide likewise carries commissioning from planning through occupancy. Put requirements, roles, evidence and handover gates into the procurement package early enough to affect design, supplier scope and programme.
Evidence matrix
Join every requirement to a result and owner
Acceptance gates
Separate readiness, performance and handover decisions
Offer comparison
Compare the evidence chain, test conditions and handover
Build the research set
Connect the plan to the directory
Use the filtered records to identify organisations for further research, then issue the same requirements, responsibilities and evidence matrix to every candidate. Directory inclusion is not proof of competence, independence, design responsibility, test quality, capacity, availability or successful delivery.
Primary references
Sources used for this guide
Sources checked 10 September 2026. Requirements vary by facility, system, operating model, market and contract; confirm the applicable design, test, safety, regulatory and acceptance obligations with the responsible specialists and authorities.